Industrial Gearbox Overhaul & Electric Motor Servicing
HEAVY TRANSMISSION & POWERTRAIN OVERHAUL

Industrial Gearbox Overhaul & Electric Motor Servicing

Turnkey teardown, gear tooth geometry inspection, journal grinding, bearing replacement, electric motor stator rewinding, and dynamic balancing up to 3,000 kg as per ISO 21940.

HEAVY ROTATING POWERTRAIN SERVICING

Industrial Gearbox Overhaul & Electric Motor Servicing

Comprehensive mechanical teardown, precision line-boring, shaft journal grinding, stator rewinding, and dynamic balancing up to 3,000 kg executed in our Jebel Ali workshop.

Helical, Bevel, Planetary & Worm

Industrial Reduction Gearboxes

Complete mechanical overhaul of heavy reduction units across cement, power, and oil & gas plants. Includes ultrasonic casing crack inspection, gear tooth pitting remediation, and precision backlash setting.

ISO 21940 STANDARD • AGMA STANDARDS
Lead, Pitch & Contact Pattern

Gear Tooth Contact & Backlash Metrology

Blue contact pattern checking under loaded and unloaded configurations to verify correct tooth contact percentage. Accurate dial gauge backlash verification complying with AGMA / DIN standards.

ISO 21940 STANDARD • AGMA STANDARDS
Machine Shop Restoration

Housing Line-Boring & Journal Grinding

In-house horizontal boring of worn gearbox split-housings, precision sleeve bushing insertion, and cylindrical grinding of scored shaft journals to restore exact center distances.

ISO 21940 STANDARD • AGMA STANDARDS
Low & Medium Voltage (LV / MV)

Electric Motor Stator Rewinding

Class H and Class F thermal insulation rewinding, precision slot cell insulation, automated winding insertion, vacuum pressure impregnation (VPI), and surge/megger dielectric testing.

ISO 21940 STANDARD • AGMA STANDARDS
As per ISO 21940

Motor Armature Dynamic Balancing (3,000 kg)

Precision balancing of squirrel cage rotors, slip-ring wound armatures, and cooling fans up to 3 Ton capacity on our Jebel Ali balancing bed, eliminating destructive shaft harmonics.

ISO 21940 STANDARD • AGMA STANDARDS
Full Spectrum Signature

No-Load Run Testing & Vibration FFT

Pre-dispatch full speed run testing measuring bearing housing temperature rise, overall vibration velocity, and fast Fourier transform (FFT) spectrum analysis for complete quality assurance.

ISO 21940 STANDARD • AGMA STANDARDS
WORKSHOP CAPABILITY & ON-SITE EXECUTION

Proven Execution Across Jebel Ali Bays & Field Skids

Photographic records from our Dubai overhaul facility and client operational skids across the UAE and GCC.

Multi-Stage Pump Overhaul JEBEL ALI WORKSHOP
PLATE REF: MF-CAP-21 API 610 BB3 / BB5

Multi-Stage Barrel Pump Complete Teardown & Overhaul

Complete dimensional logging, dynamic rotor balancing as per ISO 21940, precision diffuser refurbishment, and replacement wear rings machined in our Jebel Ali machine shop.

Field Pump Skid Installation UAE & GCC FIELD OPS
PLATE REF: MF-CAP-19 OPTICAL LASER ALIGNMENT

On-Site Pump Skid Installation & Laser Alignment

Dual-axis optical laser shaft alignment, pipe strain elimination, soft foot measurement, and baseline vibration spectrum signature capture on critical process pumps.

DIRECT REGIONAL CONTACT & HOTLINE

Mech Flow Engineering Services

Jabal Ali Industrial First - Jebel Ali Freezone - Dubai - United Arab Emirates